Alternative Project Delivery

The main factors that drive owners toward alternative project delivery are schedule issues, technical complexity, and third-party interface issues.  FNF understands each of these concerns and has the resources, expertise, and relationships available to meet the goals of your project.

  • Construction Manager at Risk (CMAR) Services
  • Design-Build Services
  • Constructability Reviews
  • General Engineering
  • Cost Modeling
  • GMP Development
  • Value Engineering
IMG_2510_excavator on hill.JPG

89 Slide Reconstruction CMAR

Arizona Department of Transportation

The FNF Team was selected as the CMAR contractor to provide preconstruction and construction services to reconstruct a portion of US 89 which was damaged in the February 2013 landslide.  Excavation of over 1,000,000 CY was required to construct a new rock buttress.

Completed Sacaton Bridge CM/GC

Sacaton Road Accelerated Bridge Construction CM/GC

Gila river indian community Department of Transportation

The FHWA’s first Accelerated Bridge Construction (ABC) project in Arizona including a lateral slide of two bridges. FNF constructed a new 2-span bridge outside of the roadway while maintaining access for the traveling public.  Once the bridge was constructed, FNF demolished the existing 4-span bridge and slid the new one into place under overhead power lines. All of this work occurred during a one-week road closure.

SR303 Design-Build

SR303L Happy Valley to US 60 Design-Build

ARIZONA Department of Transportation

FNF provided design and construction services to pulverize four miles of the existing 4-lane AC roadway and replace it with a new 6-lane PCCP urban freeway.  FNF built 21,000 LF of new sound barrier walls, improved drainage, and installed a complete lighting system for the new freeway.