Highlighted Projects

McCulloch Boulevard South to London Bridge Road

Upgrade SR 95 to a five-lane highway from McCulloch Boulevard south to Chenoweth Drive , and four-lane divided highway from Chenoweth Drive to London Bridge Road . The project also includes constructing an 8.5-mile multiuse path along SR 95 from McCulloch Boulevard south to Palo Verde North, two new noise barrier walls, improvements to numerous intersections and two new traffic signals, widening the bridge at Mockingbird Wash and building a new bridge across Falls Springs Wash. Additional funding was secured by ADOT to accelerate the much-needed milling and overlay operations of a four-mile stretch of roadway in critical condition.
|