Our Projects

FNF performs a variety of construction and engineering services all over the United States with a large concentration in the Southwest states of Arizona, California, and New Mexico.  FNF specializes in new construction, widening, and paving/roadway rehabilitation of freeways , roadways, and bridge structures.

All Projects


35th Avenue Bridge over the Salt River
This project consisted of construction of a bridge at 35th Avenue over the Salt River for the City of Phoenix.
More »
83rd Avenue Widening CMAR
FNF provided preconstruction and construction phase services for the widening of one mile of 83rd Avenue.
More »
89T Detour CMAR
FNF was selected as ADOT’s CMAR for the 89T Detour project in Page, AZ.
More »
Alma School Road CSA
FNF repaired and improved the Alma School Bridge at the Salt River crossing.
More »
Avi Suquilla Airport
Phase II Runway Relocation project at Avi Suquilla Airport
More »
Carlota Copper Stacking
FNF's five year contract with the Carlota Mine consisted of conveyor stacking run of mine ore.
More »
Casa Grande Promenade/Florence Traffic Interchange
This $18.1M, multi-phase project was located on the northeast corner of Interstate 10 and State Route 208 in Casa Grande, AZ.
More »
CM/GC Sacaton road (IR-7) Bridge over the Gila river
FNF was the CM/GC Contractor for this project which used Accelerated Bridge Construction (ABC) to slide a pre-assembled bridge over the Gila River.
More »
Coeur Rochester HLF Expansion
FNF provided construction services for Coeur D’Alene Mining’s Coeur Rochester mine operation.
More »
General Motors Southwest Proving Grounds
FNF provided preconstruction and construction services on this Construction Manager at Risk GM Southwest Proving Ground Improvements Project for General Motors near Yuma, Arizona.
More »
Gila Bend-Buckeye Hwy. (SR 85)
Construction of two new southbound roadway lanes and reconstructing the present roadway into two northbound lanes, to provide a four-lane divided roadway.
More »
Goodyear Skatepark
Work on this project included a new state of the art skate park, basketball courts, tennis courts, sand volleyball courts, a climbing wall and a water splash pad for kids.
More »
I-10 Luzena Road – San Simon
This project located about 16 miles west of the Arizona/New Mexico State Line in Cochise County consists of Milling and Replacement of the existing asphaltic concrete on Interstate 10. From the very start, this project was setup to achieve a high level of quality.
More »
I-25/NM 14 Diverging Diamond Interchange
This 18-month project consisted of converting a standard diamond interchange to New Mexico’s first diverging diamond interchange in Santa Fe along with the demolition of 5 bridges and construction of 2 bridges.
More »
I-25/US 550 Interchange
Roadway reconstruction of 2.5 miles to the I-25/US550 Interchange for the New Mexico Department of Transportation.
More »
I-40 Lithodendron Wash Bridges
This bridge replacement project for the Arizona Department of Transportation is located near Holbrook, AZ.
More »
I-40, MP 340.650 to MP 345.00
Roadway rehabilitation of 4.3 miles of I-40 in Quay County, NM.
More »
I-40/NM 118 Ramp Reconstruction
FNF reconstructed the bridge over I-40 at the Iyanbito Interchange.
More »
I-5, Asphalt Rubber
The project consists of 263,000 mix tons and will be placed on over 40 miles of Interstate 5 in the Tracy area of California.
More »
I-8 Bianco Road
This ADOT project was located in Pinal County on Interstate 8.
More »
I-8 to Gillespie Canal
This project is located on SR Bus 8 in Gila Bend, AZ, from Milepost 117 to Milepost 120, a distance of approximately 3 miles.
More »
Laughlin/Bullhead International Airport
FNF built two new taxiways, extended the main runway 500’ and overlaid the entire runway for the Mohave County Airport Authority.
More »
Omya Mine Work
FNF completed 200,000 tons of mineral aggregate crushing and hauling for Omya California.
More »
Phx Mesa Gateway Taxiway V Reconstruction
FNF was the general contractor on this Taxiway V Reconstruction airport project located at the southwest of Taxiway 12R-30L and adjacent to an existing apron.
More »
PhxMesa Gateway Airport Taxiway P
FNF provided general contracting services on this $4.5M, 150-day contract at PhxMesa Gateway Airport to reconstruct Taxiway ‘P’ and construct a new compass calibration pad.
More »
Prescott-Ashfork Highway (SR 89 and SR69)
This ADOT project consisted of widening and reconstructing of SR 89 and SR 69 including removal of the existing flyover bridge and replacement with a new bridge.
More »
Safford-Springerville Hwy (US 191) Threeway
This ADOT project consisted of construction of a new bridge crossing the Gila River, and realignment of the existing two-lane roadway including climbing and deceleration lanes.
More »
Santan Freeway (SR 202L) I-10 to Gila Drain
landscaping the SR 202L – I-10 Interchange within the cities of Phoenix and Chandler and the ADOT ROW.
More »
Sky Harbor Terminal 2 Design Build
This project consists of design and construction for rehabilitation of approximately 170,000 SF of concrete apron slabs at Terminal 2 of the City of Phoenix Sky Harbor International Airport.
More »
Solera at Johnson Ranch community
FNF was the paving contractor on this project located in the Johnson Ranch community in Queen Creek, Arizona.
More »
SR 195 Yuma (Ave. B to County 14th St.)
Construction of a new 4-lane, divided roadway for the Arizona Department of Transportation.
More »
SR 89A Vista Overlook
FNF is reconstructing State Route 89A just south of Flagstaff, AZ to widen and rehabilitate this critical route between Sedona and Flagstaff.
More »
SR303L, US60 to Happy Valley Parkway Design-Build
On June 13, the Arizona State Transportation Board awarded FNF the SR303L, US60 to Happy Valley Parkway Design-Build Project.
More »
SuperRedTan T.I. Phase I
Construction of the first phase of the major freeway interchange where the Superstition freeway meets the Santan and Redmountain freeways.
More »
Superstition Freeway US 60 Widening from Gilbert to Power
The work consisted of widening the US 60, adding high occupancy and general purpose lanes. The partnership between FNF, ADOT, and the City of Mesa demonstrated on this project added value for all stakeholders involved.
More »
Surprise Pointe CMAR
FNF provided Construction Manager at Risk Services in Surprise, AZ to develop a commercial/industrial site.
More »
Toyota Arizona Proving Grounds in Wittman, AZ
FNF has provided track construction work on various projects for Toyota's Arizona Proving Grounds.
More »
US 191 East Wilcox TI
This pavement preservation project is located in Cochise County on I-10.
More »
US 54 Tularosa MP 94.23 to 107.1
New construction of 12.5 miles of US54 for the New Mexico DOT.
More »
US 60 Flying V Canyon
This project is located in Gila County on US 60,about 10 miles west of Carrizo from Flying V Canyon to Squaw Dress Ridge (Milepost 304 to 310).
More »
US 60 Silver King
Reconstructing the existing two-lane undivided highway into a four-lane divided highway and reconstructing the existing three-lane roadway into a four-lane roadway with a raised median.
More »
US 70 Bylas Bridge Replacement
This ADOT project consists of replacing the existing steel girder bridge, built in 1957.
More »
US 89 Reconstruction CMAR
The FNF Team was selected as ADOT's CMAR contractor to reconstruct US 89 which was damaged in the February 2013 landslide.
More »
US Highway 93, Hoover Dam to MP 17
FNF provided General Contractor services to build 15 miles of a 2-lane roadway parallel to the existing 2-lane roadway.
More »
US93 Deluge Wash – Wagon Bow Wash
Replacement of 4 existing bridges with 4 new AASHTO girder bridges, also included the construction of 24 new box culverts and extensions.
More »
Viewpoint Drive T.I. (SR 89A)
FNF is the general contractor on this 4-mile new construction project for ADOT.
More »
Yuma Army Proving Grounds CMAR
FNF provided preconstruction and construction services to pave a 4.5 mile oval test track.
More »