Receive updates from FNF, Inc. on the latest developments in the industry.
See a sample newsletter
Our Projects
FNF performs a variety of construction and engineering services all over the United States with a large concentration in the Southwest states of Arizona, California, and New Mexico. FNF specializes in new construction, widening, and paving/roadway rehabilitation of freeways , roadways, and bridge structures.
All Projects
|
|
35th Avenue Bridge over the Salt River
This project consisted of construction of a bridge at 35th Avenue over the Salt River for the City of Phoenix.
More » |
|
|
83rd Avenue Widening CMAR
FNF provided preconstruction and construction phase services for the widening of one mile of 83rd Avenue.
More » |
|
|
Alma School Road CSA
FNF repaired and improved the Alma School Bridge at the Salt River crossing.
More » |
|
|
Avi Suquilla Airport
Phase II Runway Relocation project at Avi Suquilla Airport
More » |
|
|
General Motors Southwest Proving Grounds
FNF provided preconstruction and construction services on this Construction Manager at Risk GM Southwest Proving Ground Improvements Project for General Motors near Yuma, Arizona.
More » |
|
Gila Bend-Buckeye Hwy. (SR 85)
Construction of two new southbound roadway lanes and reconstructing the present roadway into two northbound lanes, to provide a four-lane divided roadway.
More » |
|
|
Goodyear Skatepark
Work on this project included a new state of the art skate park, basketball courts, tennis courts, sand volleyball courts, a climbing wall and a water splash pad for kids.
More » |
|
|
I-10 Luzena Road – San Simon
This project located about 16 miles west of the Arizona/New Mexico State Line in Cochise County consists of Milling and Replacement of the existing asphaltic concrete on Interstate 10. From the very start, this project was setup to achieve a high level of quality.
More » |
|
|
Laughlin/Bullhead International Airport
FNF built two new taxiways, extended the main runway 500’ and overlaid the entire runway for the Mohave County Airport Authority.
More » |
|
|
Prescott-Ashfork Highway (SR 89 and SR69)
This ADOT project consisted of widening and reconstructing of SR 89 and SR 69 including removal of the existing flyover bridge and replacement with a new bridge.
More » |
|
|
Safford-Springerville Hwy (US 191) Threeway
This ADOT project consisted of construction of a new bridge crossing the Gila River, and realignment of the existing two-lane roadway including climbing and deceleration lanes.
More » |
|
|
Santan Freeway (SR 202L) I-10 to Gila Drain
landscaping the SR 202L – I-10 Interchange within the cities of Phoenix and Chandler and the ADOT ROW.
More » |
|
|
Sky Harbor Terminal 2 Design Build
This project consists of design and construction for rehabilitation of approximately 170,000 SF of concrete apron slabs at Terminal 2 of the City of Phoenix Sky Harbor International Airport.
More » |
|
|
SR 195 Yuma (Ave. B to County 14th St.)
construction of a new 4-lane, divided roadway
More » |
|
|
SuperRedTan T.I. Phase I
Construction of the first phase of the major freeway interchange where the Superstition freeway meets the Santan and Redmountain freeways.
More » |
|
|
Superstition Freeway US 60 Widening from Gilbert to Power
The work consisted of widening the US 60, adding high occupancy and general purpose lanes. The partnership between FNF, ADOT, and the City of Mesa demonstrated on this project added value for all stakeholders involved.
More » |
|
|
Surprise Pointe CMAR
FNF provided Construction Manager at Risk Services in Surprise, AZ to develop a commercial/industrial site.
More » |
|
|
Toyota Arizona Proving Grounds in Wittman, AZ
FNF has provided track construction work on various projects for Toyota's Arizona Proving Grounds.
More » |
|
|
US 70 Bylas Bridge Replacement
This ADOT project consists of replacing the existing steel girder bridge, built in 1957.
More » |
|
|
US Highway 93, Hoover Dam to MP 17
FNF provided General Contractor services to build 15 miles of a 2-lane roadway parallel to the existing 2-lane roadway.
More » |
|
|
Viewpoint Drive T.I. (SR 89A)
FNF is the general contractor on this 4-mile new construction project for ADOT.
More » |
|
|
Yuma Army Proving Grounds CMAR
FNF provided preconstruction and construction services to pave a 4.5 mile oval test track.
More » |
