Asphalt Paving

Asphalt_Paving.jpgFNF’s paving operations are superior due to our quality programs on aggregate mixing and laydown controls. FNF’s state-of-the-art equipment allows for precision paving surfaces that are far superior to our competitors.  FNF in the last 10 years has received more incentives for mix quality and rideability smoothness than all combined Arizona paving contractors. FNF also has completed numerous race tracks and proving grounds for clients such as General Motors, Ford Motor Company, and Barber Motorsport Complex.

Asphalt Paving Projects


General Motors Southwest Proving Grounds
FNF provided preconstruction and construction services on this Construction Manager at Risk GM Southwest Proving Ground Improvements Project for General Motors near Yuma, Arizona.
More »
Superstition Freeway US 60 Widening from Gilbert to Power
The work consisted of widening the US 60, adding high occupancy and general purpose lanes. The partnership between FNF, ADOT, and the City of Mesa demonstrated on this project added value for all stakeholders involved.
More »
Prescott-Ashfork Highway (SR 89 and SR69)
This ADOT project consisted of widening and reconstructing of SR 89 and SR 69 including removal of the existing flyover bridge and replacement with a new bridge.
More »
Safford-Springerville Hwy (US 191) Threeway
This ADOT project consisted of construction of a new bridge crossing the Gila River, and realignment of the existing two-lane roadway including climbing and deceleration lanes.
More »
83rd Avenue Widening CMAR
FNF provided preconstruction and construction phase services for the widening of one mile of 83rd Avenue.
More »
Yuma Army Proving Grounds CMAR
FNF provided preconstruction and construction services to pave a 4.5 mile oval test track.
More »
Avi Suquilla Airport
Phase II Runway Relocation project at Avi Suquilla Airport
More »
Laughlin/Bullhead International Airport
FNF built two new taxiways, extended the main runway 500’ and overlaid the entire runway for the Mohave County Airport Authority.
More »
SuperRedTan T.I. Phase I
Construction of the first phase of the major freeway interchange where the Superstition freeway meets the Santan and Redmountain freeways.
More »
35th Avenue Bridge over the Salt River
This project consisted of construction of a bridge at 35th Avenue over the Salt River for the City of Phoenix.
More »
Gila Bend-Buckeye Hwy. (SR 85)
Construction of two new southbound roadway lanes and reconstructing the present roadway into two northbound lanes, to provide a four-lane divided roadway.
More »
SR 195 Yuma (Ave. B to County 14th St.)
Construction of a new 4-lane, divided roadway for the Arizona Department of Transportation.
More »
Viewpoint Drive T.I. (SR 89A)
FNF is the general contractor on this 4-mile new construction project for ADOT.
More »
US Highway 93, Hoover Dam to MP 17
FNF provided General Contractor services to build 15 miles of a 2-lane roadway parallel to the existing 2-lane roadway.
More »
I-10 Luzena Road – San Simon
This project located about 16 miles west of the Arizona/New Mexico State Line in Cochise County consists of Milling and Replacement of the existing asphaltic concrete on Interstate 10. From the very start, this project was setup to achieve a high level of quality.
More »
US 70 Bylas Bridge Replacement
This ADOT project consists of replacing the existing steel girder bridge, built in 1957.
More »
Toyota Arizona Proving Grounds in Wittman, AZ
FNF has provided track construction work on various projects for Toyota's Arizona Proving Grounds.
More »
I-8 Bianco Road
This ADOT project was located in Pinal County on Interstate 8.
More »
US93 Deluge Wash – Wagon Bow Wash
Replacement of 4 existing bridges with 4 new AASHTO girder bridges, also included the construction of 24 new box culverts and extensions.
More »
I-25/US 550 Interchange
Roadway reconstruction of 2.5 miles to the I-25/US550 Interchange for the New Mexico Department of Transportation.
More »
I-40, MP 340.650 to MP 345.00
Roadway rehabilitation of 4.3 miles of I-40 in Quay County, NM.
More »
US 54 Tularosa MP 94.23 to 107.1
New construction of 12.5 miles of US54 for the New Mexico DOT.
More »
89T Detour CMAR
FNF was selected as ADOT’s CMAR for the 89T Detour project in Page, AZ.
More »
I-8 to Gillespie Canal
This project is located on SR Bus 8 in Gila Bend, AZ, from Milepost 117 to Milepost 120, a distance of approximately 3 miles.
More »
US 60 Flying V Canyon
This project is located in Gila County on US 60,about 10 miles west of Carrizo from Flying V Canyon to Squaw Dress Ridge (Milepost 304 to 310).
More »
US 89 Reconstruction CMAR
The FNF Team was selected as ADOT's CMAR contractor to reconstruct US 89 which was damaged in the February 2013 landslide.
More »
US 191 East Wilcox TI
This pavement preservation project is located in Cochise County on I-10.
More »
Solera at Johnson Ranch community
FNF was the paving contractor on this project located in the Johnson Ranch community in Queen Creek, Arizona.
More »
US 60 Silver King
Reconstructing the existing two-lane undivided highway into a four-lane divided highway and reconstructing the existing three-lane roadway into a four-lane roadway with a raised median.
More »
SR 89A Vista Overlook
FNF is reconstructing State Route 89A just south of Flagstaff, AZ to widen and rehabilitate this critical route between Sedona and Flagstaff.
More »