Bridges

structural concrete.jpgFNF’s precision work on complex bridges, box culverts and retaining walls has enabled FNF to excel in a complete range of structural concrete work. FNF has completed many projects which include artistic, decorative concrete colored finishes to meet all of our owners' needs.

 

 

Bridges Projects


Superstition Freeway US 60 Widening from Gilbert to Power
The work consisted of widening the US 60, adding high occupancy and general purpose lanes. The partnership between FNF, ADOT, and the City of Mesa demonstrated on this project added value for all stakeholders involved.
More »
Prescott-Ashfork Highway (SR 89 and SR69)
This ADOT project consisted of widening and reconstructing of SR 89 and SR 69 including removal of the existing flyover bridge and replacement with a new bridge.
More »
Safford-Springerville Hwy (US 191) Threeway
This ADOT project consisted of construction of a new bridge crossing the Gila River, and realignment of the existing two-lane roadway including climbing and deceleration lanes.
More »
SuperRedTan T.I. Phase I
Construction of the first phase of the major freeway interchange where the Superstition freeway meets the Santan and Redmountain freeways.
More »
35th Avenue Bridge over the Salt River
This project consisted of construction of a bridge at 35th Avenue over the Salt River for the City of Phoenix.
More »
Viewpoint Drive T.I. (SR 89A)
FNF is the general contractor on this 4-mile new construction project for ADOT.
More »
US Highway 93, Hoover Dam to MP 17
FNF provided General Contractor services to build 15 miles of a 2-lane roadway parallel to the existing 2-lane roadway.
More »
US 70 Bylas Bridge Replacement
This ADOT project consists of replacing the existing steel girder bridge, built in 1957.
More »
I-40 Lithodendron Wash Bridges
This bridge replacement project for the Arizona Department of Transportation is located near Holbrook, AZ.
More »
US93 Deluge Wash – Wagon Bow Wash
Replacement of 4 existing bridges with 4 new AASHTO girder bridges, also included the construction of 24 new box culverts and extensions.
More »
I-25/US 550 Interchange
Roadway reconstruction of 2.5 miles to the I-25/US550 Interchange for the New Mexico Department of Transportation.
More »
US 54 Tularosa MP 94.23 to 107.1
New construction of 12.5 miles of US54 for the New Mexico DOT.
More »
I-40/NM 118 Ramp Reconstruction
FNF reconstructed the bridge over I-40 at the Iyanbito Interchange.
More »
CM/GC Sacaton road (IR-7) Bridge over the Gila river
FNF was the CM/GC Contractor for this project which used Accelerated Bridge Construction (ABC) to slide a pre-assembled bridge over the Gila River.
More »
I-25/NM 14 Diverging Diamond Interchange
This 18-month project consisted of converting a standard diamond interchange to New Mexico’s first diverging diamond interchange in Santa Fe along with the demolition of 5 bridges and construction of 2 bridges.
More »
US 60 Silver King
Reconstructing the existing two-lane undivided highway into a four-lane divided highway and reconstructing the existing three-lane roadway into a four-lane roadway with a raised median.
More »