Carlota Copper Stacking

Carlota Copper Company entered into a five-year agreement with FNF to perform construction services within their mine. The scope of work consisted of conveyor stacking run of mine ore. The ore was drilled and blasted in the pit, and then loaded into 240TN haul trucks and delivered to the Leach pad for stacking. FNF’s operation consisted of loading the ore into a chain feeder and then conveying it down a conveyor belt line to be stacked in a manner that prevents consolidation thus allowing more of the copper to be leached from the Ore. FNF has exceeded expectations in both safety and production at the onset of the project. We have trained our individuals to perform their duties above and beyond the basic “standards” of everyday safety.