Yuma Army Proving Grounds CMAR

FNF provided preconstruction and construction services to Keenan Development for the US Army on this project pave a 4.5 mile oval test track. More than 100,000 CY of earth was moved, over 41,000 CY of aggregate base was placed and over 14,000 tons of an existing asphalt track was recycled. FNF provided the design-phase services including GMP, Cost Estimating, Scheduling, Constructability Reviews, Value Engineering